final-report Aero Contractors (Nig.) Ltd 5N-EPN

Aero Contractors (Nig.) Ltd final-report accident 04/350

The accident occurred on the Runway 19R when the aircraft landed with a non-deployable left main landing gear. All efforts made by the crew before landing the aircraft to get the gear deployed were futile. The aircraft eventually touched down with a crosswind landing technique holding the right wing low. The left wing came down at about two-thirds of the runway and the aircraft veered off to the left and ran into the runway shoulder before coming to a rest with a collapsed right main landing gear at about 21m from the edge of the runway.

Previous final-report The Nigeria Police Airwing 5N-AQT

Connect With Us

Head Office:

Nnamdi Azikiwe International Airport,
Abuja, Nigeria.

NSIB News & Updates

The latest Egovt news, articles, and resources, sent straight to your inbox every month.

Nigerian Safety Investigation Bureau (NSIB) © 2024. All Rights Reserved